Rinnai announces full next day product availability

Hot water specialist Rinnai has announced 24/7 next day delivery on all hot water heating unit models, including its 48-58kW continuous flow N Series commercial hot water heating products and systems units, which boast potential reductions of 20 per cent OpEx cost, 30 per cent initial cost, 15 per cent carbon use, 75 per cent of space used, and an 85 per cent reduction in weight.

Rinnai is also guaranteeing speed of delivery, as all orders placed will be despatched within 24 hours on a next day service. Rinnai products can also be shipped the same day – or night – by priced-in special courier direct to any site in UK major towns and cities.

Rinnai is also offering direct delivery to site in one complete system consignment any combination of its entire product range of hot water heaters, electric cylinders, hybrid hot water tanks, heat pumps, plus all ancillary products such as flues, accessories, and fittings.

Rinnai’s continuous flow hot water heating units and systems guarantee limitless hot water supplies to any site – for as long as there is a constant supply of gas and water. Rinnai also guarantee to supply temperature controlled and useable hot water in unlimited quantities for all hygiene regimes in all types of sites.

Rinnai offers 24/7 technical service, product and spares availability, plus digital technology aids such as the ‘Help Me Choose’ facility at www.rinnai-uk.co.uk.

A major part of these low carbon pathways is the introduction of a comprehensive 12-year warranty on all its fully certified I2HY20 continuous flow hot water heaters, which are suited to installation as standalone gaseous water heaters or as hybrid hot water systems supporting solar thermal or heat pump technology.

The Rinnai Specification and Design Team can also prepare installation schematics that demonstrate best practise regarding legislative design considerations. This expertise will guarantee best practise to combat Legionella, G3 Certification, and a host of other onsite compliance issues. The result is a high efficiency, low emission system delivering unlimited amounts of hot water.

www.rinnai-uk.co.uk

Latest Issues

Care Roadshows Wales

Cardiff City Stadium, Cardiff
12th November 2024

LaingBuisson Social Care Summit North

Etihad Stadium, Etihad Campus, Manchester M11 3FF
Thursday 13th February 2025

Care England Conference

Church House Conference Centre, Westminster, London
13th March 2025

Care Sector Supplier Awards

London Marriott Hotel Canary Wharf, 22 Hertsmere Rd, London E14 4ED
29th April 2025

LaingBuisson Social Care Summit

etc.venues, St. Paul's, London
Thursday 5th June 2025